<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1148227851863248&amp;ev=PageView&amp;noscript=1">
toggle mobile navigation

Planning to move your business?‎

Posted by Brian Kiley on Jul 25, 2013 2:30:00 PM

Recently a plastic extruder moved to a new location in an attempt to consolidate operations and save money.   However, they neglected to consider three key points. They did not consider the design capacity of the sprinkler system, they did not consider the building construction and they did not consider the protection class – location of the building.   The sprinkler system was significantly under capacity for the commodity exposure, the frame building could not meet the necessary construction design requirements for the storage of their raw materials and finished products and the property was in a protection class 7.

Read More